SpaceFOMO
SpaceFOMO
All Tags
topic

Mission

1 company 1 moments 13 signals

Moments

Announced 81 FOMO
NASA advances PROMISE nuclear-powered lunar rover under JPL management

NASA announced it is moving forward with PROMISE, a nuclear-powered rover designed to investigate resources and surface conditions near the lunar South Pole. JPL will manage the mission and build the rover using spare flight components and engineering models from Curiosity and Perseverance. NASA is targeting a late-2028 launch and an 18-month surface mission.

Nov 7, 2026
Upcoming 3 FOMO
CSA astronaut Joshua Kutryk scheduled for Canada's first ISS spacewalk in seven years

Canadian Space Agency astronaut Joshua Kutryk and NASA astronaut Anil Menon are scheduled to exit the International Space Station on Oct. 29 for a planned 6-hour, 45-minute spacewalk to deploy the seventh International Space Station Roll-Out Solar Array (iROSA). It marks the first spacewalk by a Canadian astronaut in more than seven years and sets up a second array-installation EVA expected no sooner than Nov. 5.

Oct 28, 2026
Upcoming 3 FOMO
CSA astronaut Joshua Kutryk scheduled for Canada's first ISS spacewalk in seven years

Canadian Space Agency astronaut Joshua Kutryk and NASA astronaut Anil Menon are scheduled to exit the International Space Station on Oct. 29 for a planned 6-hour, 45-minute spacewalk to deploy the seventh International Space Station Roll-Out Solar Array (iROSA). It marks the first spacewalk by a Canadian astronaut in more than seven years and sets up a second array-installation EVA expected no sooner than Nov. 5.

Oct 28, 2026
Partial 92 FOMO
Argo completes its first Argonaut orbital demonstration despite premature mission termination

Argo's first spacecraft, Argonaut Demo, successfully launched and separated from its launch vehicle in July 2026. The company established contact, downlinked telemetry, issued commands and validated several important flight systems, including avionics, communications, attitude determination and control, and solar power generation. The mission ended prematurely before all objectives were completed. Argo said the resulting flight data is already informing the design and development of its next spacecraft.

Oct 2, 2026
Partial 92 FOMO
Argo completes its first Argonaut orbital demonstration despite premature mission termination

Argo's first spacecraft, Argonaut Demo, successfully launched and separated from its launch vehicle in July 2026. The company established contact, downlinked telemetry, issued commands and validated several important flight systems, including avionics, communications, attitude determination and control, and solar power generation. The mission ended prematurely before all objectives were completed. Argo said the resulting flight data is already informing the design and development of its next spacecraft.

Oct 2, 2026
Announced 46 FOMO
Advanced Space announces the CAPSTONE 02 lunar mission

Advanced Space announced a new two-spacecraft mission with NASA, with Terran Orbital serving as bus provider. CAPSTONE 02 is designed to demonstrate rendezvous and proximity operations and autonomy in multibody cislunar orbits, building on the original CAPSTONE mission. The company said the mission was planned to be ready to launch in 2027.

Jul 24, 2026
Announced 46 FOMO
Advanced Space announces the CAPSTONE 02 lunar mission

Advanced Space announced a new two-spacecraft mission with NASA, with Terran Orbital serving as bus provider. CAPSTONE 02 is designed to demonstrate rendezvous and proximity operations and autonomy in multibody cislunar orbits, building on the original CAPSTONE mission. The company said the mission was planned to be ready to launch in 2027.

Jul 24, 2026
Live 46 FOMO
AstroForge prepares DeepSpace-2 for a fourth-quarter 2026 launch

AstroForge was preparing DeepSpace-2, its second asteroid-rendezvous spacecraft, for launch in the fourth quarter of 2026. The company said the mission would cost less than $10.5 million including launch and that the spacecraft would perform a lunar gravity assist before proceeding toward one of roughly 28 candidate metallic asteroids. The mission is intended to validate spacecraft performance and may photograph, land on, or impact its selected target.

Jul 6, 2026
Live 46 FOMO
AstroForge prepares DeepSpace-2 for a fourth-quarter 2026 launch

AstroForge was preparing DeepSpace-2, its second asteroid-rendezvous spacecraft, for launch in the fourth quarter of 2026. The company said the mission would cost less than $10.5 million including launch and that the spacecraft would perform a lunar gravity assist before proceeding toward one of roughly 28 candidate metallic asteroids. The mission is intended to validate spacecraft performance and may photograph, land on, or impact its selected target.

Jul 6, 2026
Announced 46 FOMO
ispace revises its lunar mission schedule, moving Mission 3 to 2028

ispace clarified its updated mission schedule after confusion surrounding its March 2026 business strategy update. Mission 3, previously referred to as Mission 4, is now scheduled for 2028. Mission 4 is planned for 2029 and Mission 5 for 2030. The revised schedule reflects a reorganization of the company's Japanese and U.S. lunar development programmes.

Mar 30, 2026
Announced 46 FOMO
ispace revises its lunar mission schedule, moving Mission 3 to 2028

ispace clarified its updated mission schedule after confusion surrounding its March 2026 business strategy update. Mission 3, previously referred to as Mission 4, is now scheduled for 2028. Mission 4 is planned for 2029 and Mission 5 for 2030. The revised schedule reflects a reorganization of the company's Japanese and U.S. lunar development programmes.

Mar 30, 2026
Upcoming 28 FOMO
Rogue adds OTP-2B to its 2026 launch schedule

Rogue announced that its Orbital Test Platform 2B mission had been added to its late-2026 launch schedule. The mission was intended to advance the company's third-generation Scalable Compute Platform, host Mission Space's radiation-sensor payload, and provide hosted software testing opportunities. Rogue also linked OTP-2B to the development path for a dual-RPOD-capable spacecraft mission planned for early 2028. The announcement represented a planned mission and should not be read as confirmation that the spacecraft launched in 2026.

Jan 14, 2026
Upcoming 28 FOMO
Rogue adds OTP-2B to its 2026 launch schedule

Rogue announced that its Orbital Test Platform 2B mission had been added to its late-2026 launch schedule. The mission was intended to advance the company's third-generation Scalable Compute Platform, host Mission Space's radiation-sensor payload, and provide hosted software testing opportunities. Rogue also linked OTP-2B to the development path for a dual-RPOD-capable spacecraft mission planned for early 2028. The announcement represented a planned mission and should not be read as confirmation that the spacecraft launched in 2026.

Jan 14, 2026

Get this topic in your inbox

A weekly digest of the moments you'd regret missing. Starting soon: get on the list.