Space Mobility exits stealth with Mechanical Gravity lunar road system
56 FOMOSpace Mobility, Inc. of El Segundo exited stealth with a lunar road system of interlocking regolith tiles that restore ~99 % of Earth driving capability. Provisional patent with 185 claims filed September 2026; three utility applications filed November 2026. Ground validation underway; first lunar tile targeted 2028. Kevin Cannon to join as CTO 1 November.
Coverage
-
PR Newswire ·
Roads on the Moon: Space Mobility Unveils "Mechanical Gravity" and a Patent-Pending Lunar Road SystemSpace Mobility, Inc. of El Segundo exited stealth with a lunar road system of interlocking regolith tiles that restore ~99 % of Earth driving capability. Provisional patent with 185 claims filed September 2026; three utility applications filed November 2026. Ground validation underway; first lunar tile targeted 2028. Kevin Cannon to join as CTO 1 November.
AI-assisted summary of 1 report; numbers link to their source. Spot an error? Tell us.
More from Space Mobility
- Space Mobility · Other 30
Space Mobility interviewed at IMPACT 250 conference
Related moments
- Jet Propulsion Laboratory · Mission 82
NASA advances PROMISE nuclear-powered lunar rover under JPL management
- ispace · Contract 83
ESA and ispace-EUROPE formalize Europe's first lunar polar ice exploration rover mission
- Jet Propulsion Laboratory · Milestone 60
JPL demonstrates flexible ground-penetrating radar antenna for SkyFall Mars helicopters
- Argo Space Corp · Contract 73
Argo selected to transport an ispace Lunar Connect satellite to lunar orbit
- Cislune · Contract 30
NASA awards Cislune $850K Phase II STTR for GRASP site preparation
- Cislune · Contract 30
NASA awards Cislune $900K Phase II SBIR for PERDEX excavator
Veenie.Space Telemetry
Space Mobility, Inc. of El Segundo exited stealth with a lunar road system of interlocking regolith