SpaceFOMO
SpaceFOMO
Feed
Milestone Success / Advanced Space

CAPSTONE 02 completes its Critical Design Review

Advanced Space reported successful completion of the Critical Design Review for CAPSTONE 02, confirming the mission design was ready to move into development, integration, and testing. The mission is designed to demonstrate rendezvous and proximity operations, autonomous navigation, and cislunar communications. Its two spacecraft are planned to operate in lunar orbit, with launch targeted for 2027.

Why it matters

The review marks a project-development milestone ahead of integration and testing. Launch remains a future target, rather than a completed mission event.

The numbers

Spacecraft count
2 spacecraft

CAPSTONE 02 will use two small spacecraft in lunar orbit

Source
Spacecraft mass
~400 kg

The mission will fly two identical spacecraft, approximately 400 kilograms each

Source
Planned launch year
2,027 yr

Targeted for launch in 2027

Source
Navigation software suites
3 software suites

an operational testbed for three NASA-developed navigation software suites

Source

Coverage

1 report
  1. Advanced Space ·

    Advanced Space Completes Critical Design Review Milestone for CAPSTONE 02

    Advanced Space announced that CAPSTONE 02 had completed its Critical Design Review, clearing the mission design to proceed to development, integration, and testing. The planned mission will use two spacecraft in lunar orbit and is targeted for launch in 2027.

    39

AI-assisted summary of 1 report; numbers link to their source. Spot an error? Tell us.

Veenie.Space Telemetry

Simulate Advanced Space hardware

Advanced Space reported successful completion of the Critical Design Review for CAPSTONE 02, confirm

Get launch moments in your inbox

A weekly digest of the moments you'd regret missing. Starting soon: get on the list.